Nos projets location

Belt conveyor Tecnitude for overburden removal evacuation

« Rennes » train station : overburden removal evacuation

Contractual terms :  Delivery of Materials demolition docks before reconstruction of the train station. The flow rate requested 50 To/h and the grain size : 0/150 mm